September was supposed to be the month I install the roof.
Roof's done. I'm now a month ahead of schedule.
I hired Ben's Roofing - a roofing contractor I use regularly and they did a great job. I stopped feeling guilty on the first day they were up there. I saw all of the things I certainly would have missed or thought of too late and was content to have taken my road less traveled.
|
They make it look so easy. |
|
That was easy. |
|
Soffits and soffit vent are going in. |
|
Ella found a use for some of the wierd shapes dropped from the various fascia cuts. |
My Sunday morning run was so beautiful - I had to take some pictures. I got in 19 miles with 2500' of elevation gain between 5:30 and 8:30 - and then made it to church by 9:30. But I could have run the hills all morning. A coyote and I sized each other up as I climbed the single track. As I got closer I realized there was a second one scouting around in a small canyon just beyond the first. They were beautiful, large, and healthy. These seemed a happy pair - not the scrawny sort often seen slinking across the trails.